Sodium asphalt sulfonate teaches you to use waterproofing membrane asphalt

Upload time :2022/4/23 14:04:38

Vacant accumulation

The first roll is prefabricated on an all-plastic basis, sodium asphalt sulfonate with a longitudinal grounding of 50mm. That is, only cover the waterproofing membrane bitumen, membrane and substrate within the fixed amplitude range of all waterproofing layers; no one else can be connected to the earth. Second, all the waterproofing equipment needs to be in different positions to connect the loops and riveted seams.


The soil body of the assembly line adopts the hollow laying method: the steel wire is flattened on the bottom layer, the lap welding steel wire is prefabricated, and the flow channel, edge kneading and optometry of the sealing material are specially organized and processed. natural asphalt


2) Cold bonding method

This cold bonding method is also divided into partial bonding or full bonding. The natural asphalt factory tells you, waterproofing membrane sodium asphalt sulfonate asphalt, what is asphalt generally used for?


Stab into the roll:

The rolls are fastened to the strips at the bottom. Each roll has at least two mucosal surfaces, each with an amplitude of at least 150 mm. For coating waterproofing membranes with bituminous coatings, the membrane and substrate are a bit or sticky on the bottom layer.


All glue method

The base is prefabricated one after another, and the waterproof material asphalt is laid on the bottom line, requiring lubrication and no deformation. Fold one or more coils to half length, starting from the folded premium, not the bottom layer and the nominal roll wrap around as a general adhesive, until the adhesive is monotonous, until sticky hand after hand, pre-stacked roll after roll closed and pressed with Roller pierces in. The waterproofing roll is grounded 50 longitudinally, stopping on a suitable line segment. Transition horizontally to an untreated layer 200 to 250 mm wide. One after another riveted seams to the ground. Then, in addition to that, fold everything without folding, attach to the folded portion, and pierce the back vigorous seal three times in succession as described in the operation above.If you have any other questions, please contact us for sodium asphalt sulfonate details or contact us directly.


Company website:www.tyasphalt.com



0086 15376746681